Schools

School ICT infrastructure, from design to documented handover.

Approved ICT contractor delivery for new blocks, campus upgrades, remediation and learning-space technology, planned around live school environments, programme constraints and long-term supportability.

Modern school ICT classroom
Approved ICT contractorSchool ICT infrastructure work
Programme-aware deliveryLive sites and holiday windows
Documented handoverTests, labels, photos and as-builts

Network infrastructure

The network is designed as a complete school system.

Novatech can work from consultant information, school requirements or live-site conditions to develop a practical network scope and carry it through installation.

  • Network design, cabinet layout and fibre backbone planning
  • Switch, router, firewall and wireless hardware selection
  • Switching, access point and UPS installation
  • Structured cabling, fibre installation, splicing and testing
  • Cabinet builds, patching, remediation and labelling
  • Staff, student and guest network segmentation planning
Clean school network cabinet infrastructure

Learning & communication systems

Technology that works for classrooms, halls and the wider campus.

User-facing systems are designed around how staff and students will actually use the space, not simply around the equipment list.

Video & classroom AV

Displays, projectors, wall plates, switching and signal distribution.

Audio & sound systems

Classroom, hall, assembly and performance-space audio.

Stage lighting

Lighting, control, rigging coordination and reliable event operation.

IP bell, PA & address

Paging, bells, emergency communication and campus-wide audio.

Digital communication displays

Information screens, signage and school-wide visual communication.

Wireless & remote links

Campus links, difficult buildings and remote connectivity where required.

Modern classroom with integrated display, projection and audio technology

School operations

Planned around teaching, property programmes and real constraints.

School work often has limited access windows, occupied buildings and multiple stakeholders. The delivery plan needs to be as considered as the technical design.

01

Term-break scheduling

Scope and staging can be planned around holidays, restricted access and the need to return spaces to service on time.

02

Consultant & PM coordination

Layouts, equipment, pathways, dependencies and exclusions are made clear before installation begins.

03

Support-ready handover

Labelling schedules, test results, photographs, as-builts, rack maps and useful operational notes.

School ICT across the region.

Approved ICT contractor delivery for school projects across Franklin, Auckland and Waikato, with structured cabling, fibre optics, network hardware and Wi‑Fi available as coordinated infrastructure packages. Explore cabling →

School projects

Planning a new block, network upgrade or remediation programme?

Start with the site, timeframe and outcome. Novatech can help define the ICT pathway and delivery scope.

Discuss a school project